Results of International Open Tender N°002/2023/PR-RNI – Extension of the Kossodo and Patte d’Oie 90 kV substations and integration of the works into the control systems
Tender results
Bidder : Shandong Taikai Power Engineering Co., Ltd
The results of International Open Tender No. 002/2023/PR-RNI, concerning the extension of the Kossodo and Patte d’Oie 90 kV substations and the integration of the works into the control systems, are now available.
Our other projects

Ivory Coast
Energy and natural ressources
TERANGAZ SA’s project to build an LPG storage and filling terminal at the port of Bargny Sendou in Senegal
Read more
Ivory Coast
Energy and natural ressources
Project for the construction and operation of a 52 MWp photovoltaic solar power plant in Sokhoro, Côte d’Ivoire, by FERKE SOLAR SA
Read more
Togo
Agriculture and food safety