Results of the International Open Tender N° 001/2023/PR-RNI – Construction of a 90 kV double terne line Kossodo – Ouaga Est – Patte d’Oie

Tender results
Bidder : Groupement BUTEC.ES Maroc/Groupement BUTEC.ES Côte d'Ivoire

The results of the International Open Tender N° 001/2023/PR-RNI, for the construction of a 90 kV Kossodo – Ouaga Est – Patte d’Oie double terne line, approximately 42 km long, are now available.

 

Publication reference
N°3821
Publication date 23/02/2024
Lot number and title
Procedure
International
Number of tenders received
Six (6)
Name of temporary contractor Groupement BUTEC.ES Maroc/Groupement BUTEC.ES Côte d’Ivoire

Results summary sheet AOOI N° 001/2023/PR-RNI

Download

Our other projects

Ivory Coast
Energy and natural ressources

TERANGAZ SA’s project to build an LPG storage and filling terminal at the port of Bargny Sendou in Senegal

Read more
Ivory Coast
Energy and natural ressources

Project for the construction and operation of a 52 MWp photovoltaic solar power plant in Sokhoro, Côte d’Ivoire, by FERKE SOLAR SA

Read more
Togo
Agriculture and food safety

Second phase of the Agri-Food Processing Project in the Republic of Togo

Read more